ENVIRONMENTAL IMPACT ASSESSMENT
- Course
- ENVE402 - ENVIRONMENTAL IMPACT ASSESSMENT
- Department
- Environmental Engineering - English - Undergraduate
- Course Type
- Course
- Status
- Required
- Language
- English
- Credit
- 3
- ECTS
- 0
- T+P+L
- 3 + 0 + 0
- Course Coordinator(s)
- Assoc. Prof. Dr. Şifa DOĞAN
- Prerequisite
- -
Course Description
The objective of this course is provide knowledge on environmental impacts and environmental impact assessment. The course content includes history and basics of environmental impact assessment; framework and legal considerations for impact assessment; predictions of impacts on air, soil and water quality, noise level, and the biological environment; methods of impact analysis; public participation in the environmental impact assessment process; environmental impact assessment reports. Examples of previously used environmental impact assessment reports of various engineering projects are studied as cases studies in the lectures. The course uses lecture notes and discussions for the theoretical information and a term project practicing on how to conduct an environmental impact assessment on an imaginary project learning to use the theory in practice.
ENVIRONMENTAL IMPACT ASSESSMENT
Evaluation Tools (Active Term)
| Item | Type | Weight (%) |
|---|---|---|
| Midterm | Midterm | 35 |
| Final | Final | 45 |
| Presentation | Presentation | 20 |
| Total | 100 | |
Course Syllabus
| Week | Topic |
|---|---|
| Week 1 | Introduction to Environment |
| Week 2 | Introduction to Environmental Impact |
| Week 3 | Environmental Impacts: Water Pollution |
| Week 4 | Environmental Impacts: Water Pollution |
| Week 5 | Environmental Impacts: Air Pollution |
| Week 6 | Environmental Impacts: Soil Pollution |
| Week 7 | Environmental Impacts: Noise Pollution |
| Week 8 | Environmental Impacts: Solid Waste Pollution |
| Week 9 | MIDTERM |
| Week 10 | Environmental Impacts of Energy Systems I |
| Week 11 | Environmental Impacts of Energy Systems II |
| Week 12 | EIA Process Milestones I |
| Week 13 | EIA Process Milestones II |
| Week 14 | EIA Case Study |
| Week 15 | Project Presentation |
Reference Books & Course Materials
- 01 S.A. Kalogirou, Solar Energy Enginering Processes and Systems, Elsevier 2009.
- 02 Antonio Luque and Steven Hegedus, Handbook of Photovoltaic Science and Engineering, Wiley 2011
- 03 Planning and Installing Photovoltaic Systems 2nd Ed, Earthscan 2010.
Learning Outcomes
- L01 To define Environmental Impact Assessment (EIA)
- L02 To describe environmental impacts
- L03 To list the environmental impacts of energy systems
- L04 To imagine a project, asses its impacts and report a technial summary of an environmental impacts assessment
Program Outcomes
- P01 Develops and implements original graphic design projects by relating art and design materials to basic design and graphic design principles.
- P02 Visualizes ideas or emotional perceptions based on observation and abstract and concrete concepts in original ways, in accordance with the principles of composition.
- P03 Analyzes design problems from a multidimensional perspective and develops solutions throughout the design process; plans and manages projects, by considering the interactions among sub-disciplines and completes them within the specified timeframe.
- P04 Produces original designs across various sub-disciplines, including new media, advertising graphics, animation, printmaking, and photography, by effectively utilizing artificial intelligence and current technologies throughout the design process.
- P05 Uses research methods relevant to the field to conduct observations, comparisons, and critical analyses; evaluates and interprets designs, as well as their own design work, from artistic and theoretical perspectives, and draws theoretical conclusions.
- P06 Presents original designs and artistic works to diverse audiences through verbal, written, and visual communication methods using a portfolio while respecting intellectual property and copyright laws; evaluates their work and adapts to the professional, entrepreneurial, and business dynamics of the industry.
- P07 Takes responsibility in individual and team projects and plays an active role in project processes; plans and carries out collaborative projects with colleagues in interdisciplinary and multidisciplinary settings.
- P08 Integrates knowledge of art and design history and culture with aesthetic awareness, establishing historical and conceptual relationships between the past, present, and future of design.
- P09 Follows national and international developments in the field with a commitment to lifelong learning, effectively using foreign language skills and information technologies to share professional knowledge and expertise.
- P10 Acts in accordance with the principles of art, design, and scientific ethics, national and international values, and relevant legislation; develops inclusive design solutions that promote ecological sustainability and social benefit.
Po-Lo Matrix
| LO | P01 | P02 | P03 | P04 | P05 | P06 | P07 | P08 | P09 | P10 | Average |
|---|---|---|---|---|---|---|---|---|---|---|---|
| L01 | - | - | - | - | - | - | - | - | - | - | - |
| L02 | - | - | - | - | - | - | - | - | - | - | - |
| L03 | - | - | - | - | - | - | - | - | - | - | - |
| L04 | - | - | - | - | - | - | - | - | - | - | - |