Ana içeriğe atla
EN

PROJECT SCHEDULİNG

Ders
EMNT503 - PROJECT SCHEDULİNG
Bölüm
Mühendislik Yönetimi - İngilizce - Yüksek Lisans
Ders Tipi
Ders
Durum
Zorunlu
Dil
İngilizce
Kredi
3
AKTS
0
T+P+L
3 + 0 + 0
Ders Koordinatörleri
-
Ön Koşul
-
Anahtar Sözcükler
-

Ders Açıklaması

-

PROJECT SCHEDULİNG

Değerlendirme Araçları (Aktif Dönem)

Değerlendirme öğesi tanımlanmamış.

Ders çıktıları

  1. 01 What is Project? What are the Objectives of a Project? What is the Project Management Approach? Tools for Time Management • Gantt/Bar Chart • Critical Path Method (CPM) • Program Evaluation&Review Technique(PERT) • Other techniques (LSM, Monte Carlo Simulation) • Emphasis->Planning|Monitoring/Checking Stakeholders vs. Key Project Stakeholders. Project Management, Important for Project Management, Methods of Project Management, Brief History of Project Management
  2. 02 PMI Cycle -Deming Cycle Iron Triangle –Quadruple Approach Information Technology Project “Success” Overview Of Project Management Knowledge Areas And Project Management Process
  3. 03 Basics of Project Time Management Multiple View to the WBS-Examples, WBS Coding Scheme-Example-2 Project Scheduling and Controlling Techniques • Gannt Charts -Benefits of Gannt Charts: • Bar Charts • Mile stone Charts • Life Cycle Curves • Line of Balance (LOB)
  4. 04 • Network Techniques (Activity, Activity Precedence, Dummy Activity, Event/Path Representation, Fulkerson's Rule, Rules for Drawing Network Diagram, Use of Dummy Activites, Looping Problem, Adjacent Matrix, Draw a Network, Types of Dummy Activities) • Types of Network Represantation (Activities on Node (A-O-N) and Activities on Arrow (A-O-A)-Examples) • Construct a A-O-A Network, Construct a A-O-N Network • Fulkerson's Rule, Numbering of Events, Node Labelling
  5. 05 Critical Path(Earliest expected time/Earliest start time (Te)(in forward pass method) Examples Latest allowable occurance time (Tl)/Latest completion time (in backward pass method)- Examples Slack-example Find Critical Path-Examples
  6. 06 Single vs. Multiple Time estimate, PERT Network and Time Estimates (The Optimistic Time Estimate (to), The Pessimistic Time Estimate (tp), The Most Likely Time Estimates (tm), Expected Time or Average Time, Beta Distribution Example with PERT MS Project( Lags, Lags in Precedence Relationships (Finish to Start, Finish to Finish, Start to Start, Start to Finish ) Gannt Chart with Resources in MS Project Laddering Hammock Activities
  7. 07 To Find the Area Under the Normal Curve, transformation of Normal Distribution to standard Normal distribution, find z score and probability
  8. 08 Find the Critical Path and Project Completing Time Probability, Critical Path Variance, Critical Path Standard Deviation)
  9. 09 (Penalty/Bonus in Project Scheduling, Determine the Earning of the Project, Determine/submit the optimum duration to get higher profit for the Project)
  10. 10 Find the duration of the project, Run the simulation, Find the probability that the project will take Find the critical index, and the critical activity in project scheduling and critical path

Ders Müfredatı

Hafta Konu
Hafta 1 What is Project Management? What is the Project Scheduling (Time management) Tools for Time Management Special Characteristics of Projects, Stakeholder in Project Management
Hafta 2 Project Scheduling/Time Management, Work Breakdown Structure (WBS), Project Scheduling and Controlling Techniques
Hafta 3 Scheduling and project management, Bar(Gantt) charts
Hafta 4 Arrow and node networks, CPM (WBS, durations, resources, float, forward & backward pass, logic & constraints)
Hafta 5 Types of Network Representation (Activities on Node (A-O-N) and Activities on Arrow (A-O-A)
Hafta 6 Types of Network Representation (Activities on Node (A-O-N) and Activities on Arrow (A-O-A)
Hafta 7 Mid-term exam
Hafta 8 Schedule compression & time-cost trade-off (Crashing)
Hafta 9 Schedule compression & time-cost trade-off (Crashing)
Hafta 10 Program Evaluation and Review Technique (PERT)
Hafta 11 Program Evaluation and Review Technique (PERT)
Hafta 12 MS Project Application
Hafta 13 MS Project Application
Hafta 14 Presentations
Hafta 15 Final Exam

Referans Kitaplar & Ders Materyalleri

  1. 01 An Introducton to Management Science, “Project Scheduling”, p.412-463., David R.Anderson, Dennis J. Sweeney, Thomas A. Williams
  2. 02 Operation Research, “Network Models”, p.275-296., Hamdy A. Taha
  3. 03 Planning and Scheduling in Manufacturing, “Project Planning and Scheduling”, p. 51-81.,P.W. Glynn, S.M. Robinson
  4. 04 Operations Research in Production Planning, Scheduling, and Inventory Control, p.349-363 Lynwood A. Johnson, Douglas C. Montgomery

Ders Çıktıları

  1. L01
  2. L02
  3. L03
  4. L04
  5. L05
  6. L06
  7. L07
  8. L08
  9. L09
  10. L10

Program Çıktıları

Program çıktısı tanımlanmamış.

Pç-Dç Matrisi

PÇ-ÖÇ matrisi henüz doldurulmamış.